Diagnostic Information Poor Combined Operation Diagnostic Procedure –1/1 TM2361 (24JUN08) 9025-15-6 450DLC Excavator Operation and Tests 062608 PN=756 1 Pump Delivery Pressure Check Key on, use monitor service menu to display Pump 1 and Pump 2 Delivery Pressure on monitor. See Monitor Service Menu Operation. (Group 9015-16.) NOTE: To test with remote gauge, Perform Main Relief and Power Digging Valve Test and Adjustment. (Group 9025-25.) Set power mode at HP. Run engine at fast idle and operate boom raise function. Observe pump 1 and 2 delivery pressure when boom raise is held over relief. Are both pumps delivery pressure in 30.4—32.9 MPa range? YES: Go to Actuating Pilot Pressure Check. NO:
Adjust or replace main relief and power digging valve. Perform Main Relief and Power Digging Valve Test and Adjustment. (Group 9025-25.) – – –1/1 2 Actuating Pilot Pressure Check Key on, use monitor service menu to display Swing / Attachment Control Pilot Pressure. See Monitor Service Menu Operation. (Group 9015-16.) NOTE: Spool actuating pressure can be checked for each function by installing a tee and gauge in pilot line and then actuating that function. Perform Control Valve Spool Actuating Pilot Pressure Test. (Group 9025-25.) Run engine at fast idle and operate problem function. Observe pressure when function held over relief. Is pilot pressure above 3.70 MPa? YES:
Go to Pump Flow Rate Check Valve. NO: If pressure is low, adjust or replace valve. Perform Pilot Pressure Regulating Valve Test and Adjustment. (Group 9025-25.) See Pilot Control Valve Disassemble and Assemble. (Group 3360.) – – –1/1 9025 15 6 3 Pump Flow Rate Check Valve See Control Valve Check Valves Identification And Operation. (Group 9025-05.) Inspect check valves. Do check valves operate correctly? YES: Go to Pump Flow Rate Pilot Valve Spool Check. NO: Repair or replace check valve. See Control Valve Disassemble and Assemble. (Group 3360.) – – –1/1