. OPERATION DETAILED CONTROLS AND GAUGES 3 - 53 Air Conditioner Maintenance When carrying out inspection of a machine equipped with an air conditioner, see the "MAINTENANCE SCHEDULE CHART (PAGE 4-14)" and carry out inspection according to the table.
. OPERATION DETAILED CONTROLS AND GAUGES 3 - 53 Air Conditioner Maintenance When carrying out inspection of a machine equipped with an air conditioner, see the "MAINTENANCE SCHEDULE CHART (PAGE 4-14)" and carry out inspection according to the table.