96 RENR5042-02 Troubleshooting Section g01123348 Illustration 22 J61/P61 terminals that are associated with the air shutoff system (4) Air shutoff solenoid (5) Solenoid common (40) Overspeed verify switch g01102047 Illustration 21 D. Perform a 45 N (10 lb) pull test on each of the wires that are associated with the circuit for the air shutoff system. P1 terminals that are associated with the air shutoff system (P1-11) Air shutoff solenoid (P1-54) Overspeed verify switch (P1-67) Solenoid common E. Check the allen head screw on each ECM connector for the proper torque. Refer to Troubleshooting, “Electrical Connectors - Inspect” for the correct torque values. F.
Check the allen head screw on the customer connector for the proper torque. Refer to Troubleshooting, “Electrical Connectors - Inspect” for the correct torque value. G. Check the harness and the wiring for abrasion and for pinch points from the air shutoff solenoid to the ECM. Expected Result: All connectors, pins, and sockets are completely coupled and/or inserted, and the harness and wiring are free of corrosion, of abrasion and of pinch points.