UPPERSTRUCTURE / Pilot Valve Install Travel Pilot Valve 1. Install pilot valve (6) to main frame (1) with socket bolts (11) (2 used). 1 : 50 N m (5 kgf m, 37 lbf ft) 2. Install levers (9) (2 used) and pedals (8) (2 used) to pilot valve (6) with bolts (10) (4 used). : 8 mm 6 11 W1JB-02-07-004 : 17 mm : 50 N m (5 kgf m, 37 lbf ft) 3. Install hoses (5) (4 used) and pipes (12) (2 used) to pilot valve (6). : 17 mm : 24.5 N m (2.5 kgf m, 18 lbf ft) W1JB-02-07-003 : 19 mm : 29.5 N m (3 kgf m, 22 lbf ft) 6 12 5 W1V7-02-07-002 W2-7-16 9 8 10 6