Foreword 1.7 CE-Conforming equipment Manufacturer- supplied CE-Conforming equipment, accord- ing to document 416-93-H1120 A1 Distance: bucket pivoting point - front axle, horizontal A2 Distance: bucket pivoting point - front axle, vertical Sh Distance: road level - front axle B1 Distance: driver's eye (1) - front axle, horizontal B2 Distance: driver's eye (1) - front axle, vertical C1 Distance: centre steering wheel - centre front axle, horizontal C2 Distance: center steering wheel - centre front axle, vertical D1 Distance: headlight - centre front axle, horizontal D2 Distance: headlight - centre front axle, vertical G Weight of equipment and working load H1 Distance:
bucket pivoting point - bucket upper edge, vertical (carrying position) H2 Distance: bucket pivoting point - vision line, vertical (carrying position) J Distance: road level - bucket bottom edge (carrying position) X1 Distance: cutter protection - front axle, horizontal X2 Distance: cutter protection - road level, vertical Y1 Distance: teeth protection - front axle, horizontal Y2 Distance:
teeth protection - road level, vertical b1 Bucket connection dimension, boom width inside b2 Bucket connection dimension, boom arm b3 Bucket connection dimension, tilt rod b4 Bucket connection dimension, temporary size c Bucket connection dimension between d1 and d2, verti- cal d1 Bucket connection dimension, bolt (3) for boom d2 Bucket connection dimension, bolt (3) for tilt rod e Bucket connection dimension d1 - d2, horizontally dis- placed h Distance: bucket bottom edge - boom bolt hole l Distance:
centre of bolt - centre of fastening screw WA150-5H – VEAM934100 1-21 WA150-5H 416-93-H1120 A1 1,745 A2 1,195 Sh 630 B1 1,812 B2 2,027 C1 1,336 C2 1,686 D1 461 D2 1,170 G 3,340 H1 1,173 H2 1,656 J 270 X1 - X2 - Y1 - Y2 - b1 884 b2 88 b3 88 b4 398 c 330 d1 50 d2 50 e 0 h 160 l 60 1 Driver’s eye 2 Vision line 3 Bolts Tyres MICHELIN 17.5R25XHA Bucket 1,5 m³ 416-71-H2120