. OPERATION TRANSPORTATION OPERATION TRANSPORTATION NOTICE check the hook 3 - 124 6. Pas s wir e ropes b etween t he 1s t and 2nd trac k rollers from the front and between the 1st and 2 nd track roller s from t he rear. Do n ot attempt to lift up t he machine by hanging a wire r ope to th e bracket that is p rovided fo r fas tenin g t he machine transportation. practice will d amage the machine 7. Set the li fting angl e of the machine slowly. 8. Afte r the machin the condition and the lifting posture , and the n lift rope to 3 0° to 40 ° n lift the