. MAINTENANCE SERVICE PROCEDURE CHANGE OIL IN POWER TRAIN CASE, WASH STRAINERS (POWER TRAIN PUMP STRAINER, SCAVENGING PUMP STRAINER) WARNING 4 - 67 EVERY 1000 HOURS SERVICE Maintenanc e for e very 250 and 500 hours servic e should be carried out at the same time The operation. The undercover i s heav y. Do not go d irectly u nder th e cover when opening or c losing it. When rem oving bolts (5), carr y out the operation at the r ear of the poin t immediatel y under the cover so that it is possible to escape at a Prepare th Oil replacemen t amount: 90 liter s (23.7 8 US g 1.
Remove drain cove r (1) on the l eft side of the power train case undersi de to t ake o ff drain p lug (2), an d then loosen drain plug (P1) to drain o Tighten drain plug (P1) afte r draining o il. Do not c ompletely remove drai n plug (