. OPERATION OPERATION DIGGING AND LOADING ON LEVEL GROUND follows and drive the CAUTION 3 - 65 When d igging and lo ading on leve l gr ound set the edge machin e forwa rd. Al ways be careful n ot to load the bucket on one side and cause an un This op eration shoul d be carr ied out in 1st gear. Do not set the buck et faci ng down m ore than 20 degrees 1. Set th e edge of the bucket f acing slightly down 2. Drive the machine f orward a nd operat e the lift arm control lever forwar d to cu t a t urface each when excavating th e soil. 3. Opera te the lif t arm control le ver slight ly up and down to reduce the re sistance whe n driving the machine f orward.
When digging with t he bucke t, avoid i mposing the d igging force on on e side o f the