BODY (UPPERSTRUCTURE) / Pump Device Installation IMPORTANT: Check that O-rings (5 used) are installed to the regulator (6) mounting surface. 1. Install regulator (6) to main pump (8) as follows. Adjust the sleeve position so that two grooves in the sleeve on regulator (6) are in a line. Place regulator (6) on main pump (8). Install the pins for the feedback link into two grooves in the sleeve. Move the position of regulator (6) so that the knock pins (2 used) extended from main pump (8) can enter regulator (6). Install regulator (6) to main pump (8) with socket bolts (7) (4 used). : 8 mm : 50 N m (5 kgf m, 37 lbf ft) Feedback Link Pin Knock Pin O-Ring 6 7 8 W4GB-02-04-002 2.
Install O-ring (5) to pilot pump (1). IMPORTANT: Set pilot pump (1) with the inlet port (the larger port diameter side) facing upward. 3. Install pilot pump (1) to main pump (8) with socket bolts (2) (2 used), spring washers (3) (2 used) and washers (4) (2 used). : 8 mm : 50 N m (5 kgf m, 37 lbf ft) W2-6-11