hitachi — Removal and Installation of Control Valve

BODY (UPPERSTRUCTURE) / Control Valve Removal 5. Disconnect hoses (2, 4) from control valve (5). Cap the open ends. CAUTION: Bleed air from the hydraulic oil tank before doing any work. (Refer to BLEED AIR FROM HYDRAULIC OIL TANK on W1-4-1.) : 41 mm 6. Disconnect hoses (16, 17) from control valve (5). Cap the open ends. CAUTION: Attach an identification tag onto the disconnected hose and the pipe for assembling. 1. Remove sems bolts (27) (4 used) from cover (28). Remove cover (28) from front frame (29). : 36 mm, 41 mm 7. Disconnect hoses (18, 19, 20, 21, 22, 23 and 24) from control valve (5). Cap the open ends. : 14 mm : 19 mm, 22 mm CAUTION: Control valve (5) weight: 41 kg (90.5 lb) 8.

Remove socket bolts (25) (3 used) from control valve (5). : 10 mm 9. Attach a nylon sling onto control valve (5). Hoist and remove control valve (5) from front frame (29). W4GB-02-05-022 2. Remove sems bolt (8) from clamp (9). Remove clamp (9) from piping (7). : 17 mm 3. Remove sems bolt (12) from clamp (13). Remove clamp (13) from piping (11). : 17 mm 4. Disconnect pipings (7, 11) from control valve (5). Cap the open ends. : 36 mm W2-7-3 28 27 29