BODY (UPPERSTRUCTURE) / Control Valve Installation 4. Install O-rings (14, 15) and connect hoses (16, 17) to control valve (5). CAUTION: Control valve (5) weight: 41 kg (90.5 lb) 1. Attach a nylon sling onto control valve (5). Hoist and align control valve (5) with the mounting hole on front frame (29). 2. Secure control valve (5) to front frame (29) with socket bolts (25) (3 used) and washers (26) (3 used). : 36 mm : 175 N m (18 kgf m, 129 lbf ft) : 41 mm : 205 N m (21 kgf m, 151 lbf ft) 5. Install O-rings (1, 3) and connect hoses (2, 4) to control valve (5). : 41 mm : 10 mm : 205 N m (21 kgf m, 151 lbf ft) 6. Install O-rings (6, 10) and connect pipings (7, 11) to control valve (5). :
133 N m (13.5 kgf m, 98 lbf ft) : 36 mm 25 : 175 N m (18 kgf m, 129 lbf ft) 7. Secure pipings (7, 11) to front frame (29) with sems bolts (8, 12) and clamps (9, 13). 26 5 : 17 mm 8. Install cover (28) to front frame (29) with sems bolts (27) (4 used). : 14 mm : 50 N m (5 kgf m, 37 lbf ft) 29 28 W4GB-02-05-023 3. Connect hoses (18, 19, 20, 21, 22, 23 and 24) to control valve (5). : 19 mm : 29.5 N m (3 kgf m, 21.5 lbf ft) W4GB-02-05-022 : 22 mm : 39 N m (4 kgf m, 28.5 lbf ft) W2-7-5 27 29