hitachi — Assembly of Charging Block

BODY (TRAVEL SYSTEM) / Charging Block Assembly of Charging Block 1. Install O-rings (4) (9 used) to plugs (3) (9 used). Install O-rings (2) (5 used) to plugs (1) (5 used). Install plugs (1) (5 used), (3) (9 used) and filters (15) (2 used) to body (16). 5. Install O-ring (56) to plug (57). Install poppet (52), spring (53), shims (54, 55) and plug (57) to body (16). : 30 mm : 1/8 inch : 98 N m (10.0 kgf m, 72 lbf ft) 6. Install O-ring (47) and backup ring (46) to sleeve (45). Install O-rings (42, 44) and backup ring (43) to the body (41) assembly. Install piston (48), sleeve (45) and the body (41) assembly to body (16). : 4.9 N m (0.5 kgf m, 3.6 lbf ft) : 6 mm :

26.5 N m (2.7 kgf m, 19.5 lbf ft) 2. Install spool (20) to sleeve (21). Install sleeve (21) to body (16). Install O-ring (22) to solenoid (24). Install solenoid (24) to body (16) with socket bolts (23) (2 used). : 4 mm : 58.8 N m (6.0 kgf m, 43 lbf ft) 7. Install O-rings (33) (3 used) to plugs (34) (3 used). Install plunger (35) and spring (36) to body (16). Install plugs (34) (3 used) to body (16). : 32 mm : 3.92 N m (0.4 kgf m, 2.9 lbf ft) 3. Install O-ring (50) to adjusting screw (51). Install adjusting screw (51) to body (16) with nut (49). : 17 mm : 8 mm : 19.6 N m (2 kgf m, 14.5 lbf ft) 4. Install O-rings (28, 29 and 30) to sleeve (27). Insert spool (31) into sleeve (27).

Install spring (32), the sleeve (27) assembly, O-ring (26) and solenoid (25) to body (16) in this order. Install solenoid (25) to body (16) with socket bolts (23) (2 used). : 48.5 N m (5.0 kgf m, 36 lbf ft) : 3.92 N m (0.4 kgf m, 2.9 lbf ft) : 4 mm W3-6-13