hitachi — Removal and Installation of Front Attachment

FRONT ATTACHMENT / Front Attachment 7. Remove bucket (41) from lift arm (14). 8. Attach a nylon sling onto bucket cylinder (1). Hold bucket cylinder (1). CAUTION: Bell crank (9) weight: 240 kg (530 lb) Bucket link (28) weight: 55 kg (125 lb) 11. Install pin (10) to the pin (10) hole on bell crank (9). Attach a nylon sling onto pin (10). Hold bell crank (9). 1 10 9 Hole for Pin (10) 9 14 19 28 W4GB-04-01-005 9. Remove bolt (13), washer (11) and spring washer (12) from bell crank (9). Remove pin (10) from bell crank (9). Remove spacers (8) (2 used) from bucket cylinder (1). W4GB-04-01-006 12. Remove bolt (16), washer (18) and spring washer (17) from lift arm (14).

Remove pin (19) from bell crank (9). Remove spacers (27) (2 used) from bell crank (9). : 24 mm 10. Lay down bucket cylinder (1) to the cab side. : 24 mm 13. Remove bell crank (9) and bucket link (28) from lift arm (14). W4-1-5