Komatsu — Komatsu K EAM04 9 700 T Operation and Maintenance Manual for Bulldozers

OPERATION TRANSPORTATION UNLOADING WORK 1. Load and unload on firm level ground only. Maintain a safe distance from the edge of a road. 2. Apply the trailer brakes securely and put blocks (1) under the tires to hold the trailer in position.Set gap (3) between ramps (2) to match the distance between the left and right tracks, and keep angle (4) to a maximum of 15°. If ramps (2) bend appreciably under the weight of the machine, put wooden block (5) under the ramps to support them. 3. Remove the chains and wire ropes fastening the machine. 4. Start the engine. In a cold weather, carry out an engine warming-up run, referring to the section, “STARTING IN COLD WEATHER (3-95)“, in this manual. 5.

Set main work equipment lock lever to FREE position (F), and raise the work equipment. (When transporting with work equipment installed) 6. Set parking brake lever to the FREE position (F). 7. Set the transmission in the 1st gear and run the engine at low idle. 8. Set the travel direction toward the ramps and drive slowly. 9. The center of gravity of the machine shifts suddenly at the border between the ramps and trailer, and the machine is unbalanced and becomes dangerous. Accordingly, pass the border slowly. 10. Drive down the ramps slowly and carefully until the machine leaves the ramps perfectly. 3-123