PRECAUTIONS TO BE TAKEN WHEN WORKING 3 - MOVE THE LOAD AWAY IN HORIZONTAL DIRECTION With an arm extended forwards and the hand in vertical position directed towards the load to be moved away, move the hand in the direction of the movement to be carried out. 4 - BRING THE LOAD NEARER IN HORIZONTAL DIRECTION With an arm extended forwards and the hand in vertical position directed towards the signalman, move the hand in the direction of the movement to be carried out. 5 - LIFT THE BOOM With an arm extended in horizontal position and closed fingers, point the thumb upwards. 6 - LOWER THE BOOM With an arm extended in horizontal position and closed fingers, point the thumb downwards.
7 - SWING THE BOOM With an arm extended in horizontal position, point the forefinger in the desired swing direction. 8 - SWING THE BOOM With an arm extended in horizontal position, point the forefinger in the desired swing direction. 35