Deutz — 04.00.00 TIMING SYSTEM

© 0983 List of Job Cards Section: 8 Page: 8-2-03 Engine: S/BVM 628 Assy. Group Job Card No. Job (see also Maintenance Schedule heretofore) The Job Cards cover the following work:

Inspection Servicing Repairing Moun- ting Servicing Repairing Moun- ting Repairing Moun- ting Moun- ting 03.00.00 ENGINE FRAME 01 03.01.01 Crankcase Relief Valve Inspection/Servicing G G 04 03.02.01 Cylinder Liner Servicing G 04 03.02.03 Cylinder Liner Servicing/Reconditioning G G 04 03.03.01 Cylinder Liner Inspection/Gauging G 04 03.04.01 Cylinder Liner Removal G 04 03.05.01 Cylinder Liner Refitment G 04 03.06.01 Cylinder Liner Servicing G 46 03.07.01 Foundation Bolts Inspection G 46 03.08.01 Crankshaft system reconditioning of resiliently mounted engines G 04.00.00 TIMING SYSTEM 10 04.01.01 Camshaft Bearing Inspection/Recond.

G G 11 04.02.01 Lower Valve Drive Reconditioning G 09 04.04.01 Timing Gear Train Removal/Refitment G 10 04.05.01 Camshaft Removal G 10 04.06.01 Camshaft Refitment G 10 04.06.02 Valve Timing Checking G 09 04.08.01 Timing Gear Train Inspection/Gauging G 05 04.09.01 Flywheel Removal/Refitment G 05 04.11.01 Crankshaft Gear Removal/Refitment G 14 04.13.01 Water Pump Idler Gear Removal/Refitment G 14 04.14.01 Pump Chest Removal/Refitment G 05 04.16.01 Coupling Flange Removal/Refitment G 49 04.16.02 Filling of Oil Pump G