Deutz — 01.06.01 Valve Guide Clearance Checking / Reconditioning

© 1084 Job Card No.: 01.06.01 Page 2 of 2 Valve Guide Clearance Checking / Reconditioning Engine: S/BVM 628 Filing No.: 0178-08-10 1799 Refitment of guides is done after undercooling (shrin- king) in liquid nitrogen (boiling temperature: -195,8°C) down to between -170°C and -195°C. To ensure that the guides are cooled deep into their cores, check that the nitrogen has stopped boiling (see also Section 3.7). Make also sure that all shrink-fit surfaces are per- fectly clean (metallically bright). Introduce valve guide into cylinder head until the dimensions specified (page 1) have been reached. Grind-in and check valve (Job Card 01.07.01).

Renew the 0-ring for sealing the valve stem abd push it into its groove with the aid of the valve stem, using a second valve stem to prevent the ring slipping beyond the groove. Install valves (Job Card 01.05.01). © 51 238 0 © 51 2