Deutz — 02.04.01 Bearing Shell Inspection

© 1083 Bearing Shell Inspection Job Card No.: 02.04.01 Engine: S/BVM 628 Filing No.: 0178-01-10 1852 Inspection Job Cards: Inspection of big-end bearings is required whenever - 02.03.02 removing pistons. If the wear pattern is unsatisfacto- - 02.03.03 ry of if deep scoring and/or embedments of foreign - 02.05.01 (Big-end bearings) particles are discovered. - 02.06.01 (Big-end bearings) - 02.07.01 (Main bearings) Inspect one main bearing also, in accordance with - 02.08.01 (Main bearings) the Maintenance Schedule, and, if in bad shape, the rest als. The first bearing to be inspected should be the central one.

Big-end bearings and main bearings which have already been running for 20 000 hours with distillate fuel, 18 000 hours with mixed oil or heavy oil 1 and 15 000 hours with heavy oil 2 must be renewed, even if they are still of good appearance, since they are likely to have lost their running-in properties due to advanced wear and tear at this stage. Renewal of all big-end bearings and main bearings is due at the end of about 40.000 running hours. Bearings to be refitted must be inspected with regard to: G adequate spread (Job Card 02.03.02), G correct running clearance (Job Card 02.03.03), G wear pattern.

Depending on the number of running and operating conditions, the wear patterns of bearing shells may differ widely. In all cases of doubt, therefore, it will be advisable to consult a DEUTZ serviceman.