©0185 Main Bearing Refitment Job Card No.: 02.08.01 Page 3 of 3 Engine: S/BVM 628 Filing No.: 0178-01-10 1837 Where studs (2) must be renewed, apply Deutz DW 60 compound to length of threads of new studs, screw into crankcase as far as they will go and tighten through 130 Nm (13 kpm). Refit oil sump (if removed) after application of Deutz DW 48 compound as a continuous "bead" (Fig. 5) of 2 - 3 mm width (not more) on the joint face. Bead © 51 263 0 Fig. 5 Bead © 51 263 0 © 51 263 0