Deutz — 02.10.02 Piston Ring Grooves Checking

© 0392 Piston ring grooves Job Card No.: 02.10.02 Engine: S/BVM 628 Filing No.: 0178-07-10 1093 Checking Piston Ring Grooves Following each piston removal renew piston rings and gauge axial clearance "S" between new piston ring and bottom flank or ring groove at 8 points offset by 45°, Fig. 1. Tools: - Feeler gauge Job Cards: - 02.10.01 - 02.11.01 © 50 618 1 Fig. 1 Measuring points for gauging axial clearances Job: G Fit new piston rings as per job 02.10.01. G Mark the insertion depth of 5 mm on a 0,4 mm feeler gauge, Fig. 2. G Press new piston ring against groove base in the area of gauge point. G Introduce feeler gauge at bottom flank of piston ring between piston and ring.

If at any location the gauge can be inserted more than 5 mm, the piston must be reconditioned as per Job Card 02.11.01. Reconditioning will also be necessary if it must be expected that the axial clearance "S" is exceeded within the next piston overhaul © 50 696 1 interval according to the Maintenance Sche- Fig. 2 Measuring procedure for gauging axial dule. clearances © 50 618 1 © 50 618 1 © 50 696 1 © 50 696 1