© 1283 Foundation Bolts Inspection Job Card No. 03.07.01 Engine: S/BVM 628 Filing No.: 0178-46-10 1173 Inspection Job Card: - 02.02.01 The effects of heat and internal stressing may effect the foundation, so make sure that engine foundation Tools: bolts are tight (even where piping renders the access - Standard tools difficult). Inspection is especially important during the initial 50 running hours of the engine. Job: Strike chocks/shims (2) and (3) respectively with a hammer and check that this will produce a solid metallic sound. Failing this, bolts (4), (5), (6) are liable to be slack and must therefore be retightened as specified by the foundation erector.
Thereafter, mea- sure crankweb deflection (job 02.02.01). Cleanliness is very important, in particular, do not let the foundation come in contact with oil or water. Rigid Mounting Resilient Mounting © 51 278 0 Rigid Mounting Resilient Mounting © 51 278 0 © 51 278 0