Deutz — 04.06.01 Engine Timing, Camshaft Refitment

© 0592 Engine Timing Job Card No.: 04.06.01 Page 3 of 4 Engine: S/BV 6/8/9 M 628 Filing No.: 0178-10-10 2070 G Screw guide arbour with its long grub screw end into camshaft at engine driving end. G Carefully introduce camshaft through bearing bushes with guide arbour. G Rotate camshaft with gear until ”R” mark or resp. notch (3) on gear (1) coincides with mark on timing chest sealing surface. G Mesh gear with idler gear. G Screw off guide arbour. © 50 521 2 Fig. 7 Camshaft drive gear marking G nsert dowel pin (10) and position guide roller (7) with guide plate (6). G Screw in hex. bolt (11) together with locking plate (12). G Tighten hex. bolt (11) and secure with locking plate (12).

G Fit cover (14) with new gasket (8). G Tighten hex. bolts (9). G Tighten hex. nuts (13) according to specification, section 3.5, line 61. G Measure backlash of gear, job card 04.08.01. © 50 642 1 Fig. 8 Camshaft fixing "KGS" Finishing Work G Fit cover with rotary starting air distributor and new gasket as per job card 10.02.01. G Release lower valve gear, job card 04.02.01. G Fit rocker arms, job card 01.02.02. G Adjust valve clearance, job card 01.01.01. G Check valve timing, job card 04.06.02. G Fit rocker chamber cover. G If removed, refit injection pumps, job card 07.04.01. G If removed, refit crankcase cover in the camshaft area with new gaskets; tighten hex.

bolts accor- ding to specification, section 3.5, line 28. © 50 521 2 © 50 521 2 © 50 642 1 © 50 642 1