Deutz — 05.04.14 Woodward UG8D/UG8L Hydraulic Governor Linkage Setting, S/BV 9 M 628

© 0484 Job Card No.: 05.04.14 Page 4 of 12 Woodward UG8D/UG8L Hydraulic Governor Linkage Setting Engine: S/BV 9 M 628 Filing No.: 0178-29-10 1809 Synchronizing the Injection Pumps 2. Detach link C1 at point A5 (*) - Fig. 4 -. © 24 926 1 Fig. 4 3. Fully screw in stop screw (*) at point A 13 - Fig. 5 -. Record screw setting (**) where linkage is adjusted repeatedly. © 24 927 1 Fig. 5 4. Release screw (*) - Fig. 6 - to remove lever on starting fuel allowance stop, point A17. © 24 928 1 Fig. 6 © 24 926 1 © 24 926 1 © 24 927 1 © 24 927 1 © 24 928 1 © 24 928 1