© 0484 Barber-Colman plus 8 Electronic Governor Linkage Setting Job Card No.: 05.04.14 Page 1 of 12 Engine: S/BV 9 M 628 Filing No.: 0178-29-10 1811 Servicing / Setting Tools: For removing the injection pumps, it is necessary to - Standard tools remove the linkage between the pumps and to de- - Sealing compound Deutz DW 59 tach the linkage between pump and governor. After (Section 3.6), the pumps have been refitted , the linkage has to be - Sealing wax red, part No.: 0100 7740 checked and adjusted as necessary. After a governor has been remounted, the setting of Job Card: the linkage between governor and pump has also to be checked and adjusted as necessary.
- 05.00.01 We recommend that these jobs be entrusted to a DEUTZ specialist, since otherwise the warranty will possibly be affected. Only in emergency may this work be carried out by machine-room personnel. In that case, a DEUTZ specialist should be called in at the next opportunity to check and seal the control linkage. Job: Stop engine and observe safety precautions (job 05.00.01). Removing the Linkage When Removing Injection Pumps Remove linkage covers,. Remove covers at points A21 and A24 (Fig. 1). © 24 912 1 Fig. 1 © 24 912 1 © 24 912 1