Deutz — 05.04.15 Control Linkage

© 0199 Job Card No.: 05.04.15 Page 2 of 5 Control Linkage Engine: S/BV 6/8/9 M 628 Filing No.: 0178-29-10 2004 Inspecting Telescopic Piece C1(Fig. 1) Undo fitted hex. bolt (*) - Fig. 2 -. At the other end of the link, release locking plate and screw out fitted hex. bolt. Take link rod out of forked lever, compress by hand, and release. The resistance thereby occur- ring should result solely from the compression spring inside the telescopic piece (1) - Fig. 1 -. The link rod should then return to its original position. If not, the telescopic piece must be reconditioned. Reassembly is in the reverse order, the fitted hex. bolt (*) - Fig.

2 - then being inserted with locking compound Deutz DW 57. The sliding surface of the link ends (**) must be absolutely free of locking compound. © 50 069 1 At the other end of the link rod, secure the fitted hex. Fig. 2 Telescopic piece bolt with a new locking plate. Reconditioning Renewing Heads of Links C3 - Fig. 1 - Release locking plates of the two fitted hex. bolts (*) - Fig. 3 - and remove the bolts. Take link rod C3 out of the forks. © 50 071 1 Fig. 3 Linkrod © 50 069 1 © 50 069 1 © 50 071 1 © 50 071 1