Deutz — 06.04.01 Charge Air Cooler Removal / Refitment

© 0595 Charge Air Cooler Removal / Refitment Job Card No.: 06.04.01 Engine: S/BV 6/8/9 M 628 Filing No.: 0178-58-10 1136 Job: Tools: Removing the Cooler - Standard tools Close shut-off valves in water feed and discharge - Hoist piping. Open drain cock. Disconnect water piping. Retain charge air pipe (1) plus control unit and sup- port to prevent turning sideways. Retain cooler (2) by hoist. Unscrew (6) bolts (7) and remove pipe (5). Unscrew bolts (9) and remove cooler (2). Refitting the Cooler Inspect gasket (8) and (10) and replace if defective. Cooler refitment is made in the reverse order. Connect feed and discharge piping as well as breather pipe.

Fill up system with a newly prepared coolant (see Section 6.4). © 51 405 0 Fig. 1 © 51 405 0 © 51 405 0