Deutz — 07.03.03 Injection Piping Renewal

© 0199 Injection Piping Renewal Job Card No.: 07.03.03 Engine: S/BVM 628 Filing No.: 0178-21-10 2057 Reconditioning Job Card: - 07.03.01 If, due to frequent reassembly or excessive tighte- ning, the end of the injection piping has been con- Tools: tracted, i.e. the inside diameter is less than 3.0mm, - Standard tools the piping must be renewed. - Socket spanner with tommy bar (Section 1.8) Job Remove injection piping (job 07.03.01). Screw off clamping sleeves (14) at both ends of the piping by means of socket spanner (5) - Fig. 1. Left-hand thread Withdraw union nuts (2 and 3) from piping - Fig. 2. Undo fully cap screw (1). Renew O-seals (15 and 16), as well as clamping sleeves (14).

Assemble new injection piping in the reverse order with screwed union fittings and mount as described for job 07.03.01. © 24 964 1 Fig. 1 © 24 965 1 Fig. 2 © 24 964 1 © 24 964 1 © 24 965 1 © 24 965 1