Deutz — 10.06.01 Pressure Reducer Station Servicing

© 1283 Pressure Reducer Station Servicing Job Card No.: 10.06.01 Engine: S/BV M 628 Filing No.: 0178-32-10 1383 Servicing Tools. - Standard tools Drain condensate and clean filter elements. This is possible while the engine is running. In hand lever position I and III, the H.P. lien is connected to the L.P. line through one filter and one pressure reducer each. The low pres- sure is indicated by gauge (6) direct; it can be adjusted with screws (5). In lever position II, both filters and pressure reducers are connec- ted in the L.P. line. In position IV, the H.P. lien is isolated, while the L.P. line is connected to the atmosphere. Job Draining Condensate Operate rods (1).

Cleaning the Filter Clean only filters not in service: filter(4) in lever position I and filter (3) in position III. With the engine shut down, both filters can be cleaned in position IV. Procedure Unscrew plug and remove filter. After cleaning filter, dry by air blast. Reinstall filter and fit plug with washer. © 51 353 0 © 51 353 0 © 51 353 0