Ditch Witch / Charles Machine Works SK500 — Above-Ground Jobs

Prepare - 22 SK500 Operator’s Manual Gather Information Gather Information A successful job begins before you start working. The first step in planning is reviewing information already available about the job and jobsite. All Jobs Review Job Plan Review blueprints or other plans. Check for information about existing or planned structures, elevations, or proposed work that may be taking place at the same time. Arrange for Traffic Control If working near a road or other traffic area, contact local authorities about safety procedures and regulations. Plan for Emergency Services Have the telephone numbers for local emergency and medical facilities on hand.

Check that you will have access to a telephone. Ground-Penetrating Jobs Notify One-Call Services Call area One-Call or similar services and have existing lines located and marked. Call any utilities in your area that do not subscribe to One-Call. Above-Ground Jobs Locate Overhead Lines Note location and height of all overhead lines in jobsite and ensure that fully lifted attachment and/or load will not touch lines. CMW