SAFETY PRECAUTIONS DURING OPERATION WARNING: Failure to follow these safety precautions may lead to a serious accident. CHECK BEFORE STARTING Always carry out the following inspection and maintenance before starting work each day. 1. Greasing G Supply grease to the greasing points shown in the diagram below (total: 16 places). 1 2 A C 3 4 5 B DE 8 6 7 2. Check for cracks, furrows in the base metal. OPERATIONS ON SLOPES G When working on slopes, there is danger that the machine may lose its balance and turn over when the swing or work equipment are operated. Always carry out these operations carefully.
INCORRECT G Do not swing the work equipment from the uphill side to the downhill side when the bucket is loaded. This operation is dangerous. (See the upper diagram on the right.) AN113040A 29 1. Arm cylinder (1 place) 5. Boom foot pin (2 places) 2. 3 places for A, B C 6. Boom cylinder (2 places) 3 Boom cylinders (2 places: D, E) 7. Backhoe and link (3 places) 4 Positioning cylinder (1 place) 8. Bucket cylinder (2 places)