Front Axle 33 33–01 Knuckle Pin Lubricating pumping until new grease is seen at the seal on the bushing opposite the grease fitting. Hold a pressure gun on each fitting until fresh grease appears. See Fig. 1 . This will ensure that all the old contaminated grease has been forced out. It is not necessary to exceed 4000 psi (27 560 kPa). The best distribution of new lubricant and the best purg- ing of old lubricant occurs when about 4000 psi (27 560 kPa) pressure is applied at the grease gun nozzle. Using a 40 to 1 booster, the air should be limited to 100 psi (689 kPa); using a 50 to 1 booster, the air should be limited to 80 psi (551 kPa). Higher or lower pressures are not recommended.

When lubricating knuckle pin bushings at M1 through M5, do not raise the front axle. Wipe the lube fittings clean, and apply multipurpose chassis grease until new grease is seen at the grease seal on the bush- ing opposite the fittings. The grease seal will accept the grease pressure without damaging the seal, and is designed to have grease pumped out through it during lubrication. Even if grease leaks out around the top or bottom plate gasket, continue pumping until new grease is seen at the seal on the bushing opposite the grease fitting. 1 33–02 Tie-Rod End Inspecting 1. Shake the cross-tube.

Movement or looseness between the tapered shaft of the ball and the cross-tube socket members means that the tie- rod end assembly must be replaced. A 2. The threaded portion of the tie-rod end assembly must be inserted all the way into the cross-tube split, for adequate clamping. See Fig. 2 . Replace the parts if this cannot be done. For instructions, see the axle manufacturer’s service manual. 3. Check the tie-rod end nut and clamp nut torques. Tighten the tie-rod end nut 100 lbf·ft (136 N·m), and tighten the clamp nut 40 to 55 lbf·ft (54 to 75 N·m). 10/20/93 1 f320032a A. Pump lubricant into each grease fitting until fresh grease comes out here. 1.

Grease Fitting 33–03 Tie-Rod End Lubricating Fig. 1, Meritor Front Axle Wipe the tie-rod end grease fittings clean, then pump multipurpose chassis grease (NLGI grade 1 or 2) to the tie-rod ends until all used grease is forced out and new grease appears at the ball stud neck. When lubricating knuckle pin bushings for Initial Maintenance, raise the front axle until the front tires are off the ground. Wipe the lube fittings clean, and slowly feed multipurpose chassis grease (NLGI grade 1 or 2) into each bushing area while turning the wheels from extreme right to left and back again (lock to lock). This will eliminate small air pockets and improve grease distribution.

33–04 All-Axle Alignment Checking Lower the tires to the ground, and regrease both top and bottom bushings until new grease is seen at the seal on the bushing opposite the fittings. The grease seal will accept the grease pressure without damag- ing the seal, and is designed to have grease pumped out through it during lubrication. Even if grease leaks out around the top or bottom plate gasket, continue Drive Axle Alignment Checking Check the axle alignment, parallelism, and thrust angle measurements for the rear drive axles. Use the applicable procedure and specifications in Group 35 of the Business Class ® Trucks Service Manual. Business Class Trucks Maintenance Manual, June 2001 33/1