Komatsu — LUBRICATING

. MAINTENANCE MAINTENANCE PROCEDURE LUBRICATING 4 - 53 EVERY 500 HOURS MAINTENANCE Maintenan ce for every 25 0 hours service should be carried out a t the NOTICE During th e initial 50 hours breaking-in period f or a new machin e, carry out lu I f digging operations have been carried out in water (such as di gging holes), always carry out greasing for the pins that were nder wa F or heavy-duty operations , such as hydraulic breaker w ork, ca rry out 1. lower t he work equipm ent to the ground, then stop the engine 2. Using a grease pump greas fittings shown by arro 3. After g reasing, wipe o ff any old grease t hat was pushe d out.

(1) Boom cylinder rod pin (2) Arm cy linder foot pin (1 (3) Boom- Arm coupling pi (4) Arm cy linder rod end ( (5) Bucket cylinder foot pi (6) Boom cylinder foot pin