Hyundai Construction Equipment HX220L — 1. OPERATIONAL PERFORMANCE TEST

2) SPEC : Actuator operating : 1~5 V TEST PROCEDURE (1) Test 12 : Check voltage at CN-52 (39) and ground. Prepare 1 piece of thin sharp pin, steel or copper. Insert prepared pin to rear side of connectors : One pin to (39) of CN-52. Starting switch ON. Check voltage as figure. ① ② MCU PIN ③ ④ CN-51 CN-52 1 2 3 4 5 6 7 8 9 10 CN-52 Female 20 30 11 21 31 32 33 34 36 37 38 39 40 39 GROUND Multimeter 220S6MS12 6-54