Komatsu — INSTALLATION OF TRACK SHOE ASSEMBLY

DISASSEMBLY AND ASSEMBLY TRACK SHOE ASSEMBLY INSTALLATION OF TRACK SHOE ASSEMBLY Carry out installation in the reverse order to removal. # Adjust the tension of the track shoe. For de- tails, see TESTING AND ADJUSTING, Test- ing adjusting tension of track shoe. # Tension of track shoe: 20 – 30 mm 2 Master link bolt: Seizure prevention compound (MARUZEN MOLYMAX No. 2 or equivalent) 3 Master link bolt: Initial torque: 147.1 ± 19.6 Nm {15 ± 2 kgm} Retightening angle: 180 ± 10є # When winding the track shoe, use a bar, etc. to prevent the link from parting from the sprocket. # Take proper measures so that the mating faces and threads of the master link will not be rusted, bruised, or deformed.

In addition, check that the mating faces and threads are free from dirt. # Tighten the master link bolts in the order of D31/37EX,PX-21 30-59 .