DISASSEMBLY AND ASSEMBLY OPERATOR’S SEAT FRAME ASSEMBLY 22. Disconnect drain collecting block hose (39). INSTALLATION OF OPERATOR’S SEAT FRAME ASSEMBLY 23. Disconnect 2 heater hoses (40). (If the machine is equipped with the heater or air conditioner) 24. Disconnect 3 floor wiring harness clamps (41). Carry out installation in the reverse order to removal. 25. Disconnect heater unit wiring connector (CN92) (42). (If the machine is equipped with the heater or air conditioner) 3 Mounting bolt: 245 – 309 Nm {25 – 31.5 kgm} # Adjust the decelerator pedal linkage and fuel control linkage.
For details, see TESTING AND ADJUSTING, Adjusting decelerator pedal linkage and Adjusting fuel control link- age. 3 Mounting bolt: 25.5 Nm {2.6 kgm} 26. Disconnect HST pump hoses (43) and (44). (43): CPB port side of HST pump (44): PH port side of HST pump Refilling with water # Add water through the water filler to the specified level. Run the engine to heighten the water temperature. Then, check the wa- ter level again. Refilling with oil (Hydraulic tank) # Add oil through the oil filler to the specified level. Run the engine to circulate the oil through the system. Then, check the oil level again. Bleeding air (HST circuit) # Bleed air from the HST pump circuit.
For de- tails, see INSTALLATION OF HST PUMP ASSEMBLY. 27. Remove the mounting bolts and lift off opera- tor’s seat frame assembly (45). 4 Operator’s seat frame assembly: 170 kg 30-80 D31/37EX,PX-21