John Deere 700H Crawler Dozer — Remove and Install

Heating and Air Conditioning 11. Install evaporator or heater core. 12. Install (11, 10, 13, and 14). Tighten cap screws. 13. Connect (4—6, 8 and 9). Tighten cap screws (3 and 7). T118221B –UN–03NOV98 14. Connect hoses (1 and 2). 18 1830 36 15. Install access cover and tighten cap screws. 16. Install new receiver/dryer. 17. Apply refrigerant oil to new O-rings and immediately connect lines. 18. Add oil. (See R134a Component Oil Charge in this group.) T118220B –UN–05NOV98 19. Evacuate system. (See Evacuate R134a System in this group.) 20. Charge the air conditioning system.

(See Charge R134a System in this group.) 1—Receiver-Dryer Hose-to-Condenser 2—Receiver-Dryer Hose from Evaporator 3—Cap Screw (2 used) 4—Two Heater Hoses-to-Under the Seat Heater Core 5—A/C Harness Connector-to-Cab Harness Connector 6—Expansion Valve Hose-to-Compressor 7—Cap Screw (8 used) 8—A/C Blower Fans and Switch Connector 9—Low Pressure Switch Connector 10—Plate 11—Evaporator/Heater Core Cover 12—Cap Screw (2 used) 13—Bracket 14—Expansion Valve T118219B –UN–03NOV98 CED,OUTX547,182 –19–16APR99–4/4 TM1859 (14JUL04) 18-1830-36 700H Crawler Dozer 071404 PN=480