eng — METHOD OF LIFTING MACHINE

. OPERATION TRANSPORTATION LIFTING PROCEDURE check that the area slings, spreader bars and other lifting ropes to the lifting positions. to the 4. Fit protector blocks at the contact points between the lifting equipment and the body to prevent damage to the King equipment. 3 - 99 Lifting work can be car ried out only with mac hines displaying a lifting mark. When carrying out the lifting operation, stop t he machine on firm l evel ground, and do as follows. 1. Start the engine, se t the dump lever to the FLOAT position , and check that the bod y operation caution lam p goes ou t. 2. Stop the engine, apply the brake, and around the operato r's compartment is saf 3.

equipment to matc REMARK The lifting positions f conditions. or the machine differs accordin sitions (1) and (3) al:4 places (2 at front, 2 at rear) Positions (1) and (2) Machine with body:Po Tot al:4 places (2 at front, Machine without body: Positions (1) and (2) Total:4 places (2 at fro nt, 2 at rea The 5. When the machin e comes off the grou nd (raised 10 t o 20 cm(3.9 to 7.9 in)), s top the lifting operation , check carefull y that the machine is bal anced and that the wire ropes are not lo ose, then continue the l ifting operation slowly.