eng — CLEAN INSIDE OF COOLING SYSTEM

. MAINTENANCE SERVICE PROCEDURE MAINTENANCE SERVICE PROCEDURE then run for another 5 4 - 23 3. Prepare the container to catch the co drain valve coolant. Drain the air compressor unit for the b plugs (4 pla 4. After drainin g the coolant, close drain water. 5. When the ra diator is full, start the eng Keep the e ngine running at low idle water temp erature reaches more tha 6. After flushin g, stop the engine, open it after all th e water has drained out. 7. After draini ng the water, clean the co For the clea ning method, see the ins 8. After flushin g, open drain valve (3), d 9. Close drain valve (3). 10.

Replace the corrosion resistor, and o For replacin g corrosion resistor, see "REPLACE CORROSION RESISTOR CARTRI 11. Add coolan t mixed with antifreeze un til it overflows from the water filler. Decide the proportions of antifreeze a nd water according to the table for the mixing rat 12. To remove the air contained in the coolant, run the engine at low idle for 5 minute is, leave the coolant filler cap OFF.) minutes at high idle. (When doing th 13. Stop the en gine. About 3 minutes la ter, supply the coolant up to the coolant filler, th 14. Drain the co olant inside reserve tank coolant to a point between the H and