REMOVAL AND INSTALLATION 2nd BOOM REMOVAL OF 2nd BOOM 1 - Remove the bucket, the bucket cylinder, the arm cylin- der and the arm. For details see: REMOVAL OF BUCKET REMOVAL OF BUCKET CYLINDER REMOVAL OF ARM CYLINDER REMOVAL OF ARM 1 2 - Start the engine and bring the 2-piece boom (1) into a vertical position. Lower it until it rests on the ground and switch off the engine. RKPB1261 3 - Put a sling round the RH cylinder (2) of the 2-piece boom and remove the nut (3), the screw (4) and the shim (5). 2 2 1 5 5 4 - Slide out the pin (6) that connects the RH cylinder (2) to the 2-piece boom (1) until the piston rod is completely disconnected.
3 6 2 3 6 4 RKPA 7211 5 - Start the engine and completely retract the piston rod of the RH cylinder. To hold the piston rod in a fully retracted position, tie it with wire and switch off the engine. 6 - Lower the cylinder until it is in a vertical position, leaving the boom tied up. 7 - Repeat these operations from point 3 to point 6 in order to disconnect the LH cylinder (7). 2 3 RKPA 7221 8 - Hook the 2-piece boom to the hoisting tackle. 9 - Remove the screws and take out the pin (8). 8 2 3 4 10 - Take off the 2-piece boom. 2-piece boom: 195 kg 1 7 RKPA 7610 30-119 PC95R-2