Transmission - Power Takeoff Section 120-0090 SM - 272 8. Install and stake set screw (11) in housing (12). 9. Install pipe plug (13) in the end of pinion shaft (8). INSTALLATION Numbers in parentheses refer to Fig. 1. Note: Tighten all fasteners to standard torques listed in Section 300-0080, STANDARD BOLT AND NUT TORQUE SPECIFICATIONS. Note: Tighten all hydraulic lines fitted with ORFS connections, as described in Section 250-0000, BRAKING SYSTEM SCHEMATIC. Renew all 'O' rings where used. WARNING To prevent personal injury and property damage, be sure wheel chocks and lifting equipment are properly secured and of adequate capacity to do the job safely. 1.
Using suitable lifting equipment, position power takeoff assembly to torque converter housing and secure with bolts (18) and lockwashers (19), using the same quantity and thickness of shims (15, 16 & 17) removed during removal. 1 - Snap Ring 2 - Bearing 3 - Snap Ring 4 - Output Shaft 5 - Driven Gear 7 - 'O' Ring 8 - Pinion Shaft 9 - Bearing 10 - Pinion Gear 11 - Set Screw 12 - Housing 13 - Pipe Plug 14 - Bearing 2. Remove pipe plug (6) from housing (12). Fig. 2 - Cutaway View of Power Takeoff Assembly Note: Pipe plug (6) hole serves as an access for checking the backlash. 3. Position driven gear (5) in housing (12) and slide output shaft (4) through driven gear (5).
Press output shaft (4) into bearing (2), if necessary. 3. Position a dial indicator on housing (12) so that the plunger rests against a tooth of pinion gear (10). 4. Press bearing (14) onto opposite end of output shaft (4) and install snap ring (1). Be sure bearing (14) is seated against output shaft (4) shoulder, with shielded side of bearing facing toward snap ring (1) (facing out). 4. Hold or block either the power takeoff drive gear, or the converter charging pump driven gear, whichever is the case, so that it cannot revolve. 5. Set the dial indicator to a zero reading then, with a screwdriver, turn pinion gear (10) back and forth as far as possible.
The maximum allowable backlash is from 0.381 - 0.635 mm (0.015 - 0.025 in). 5. Rotate driven gear (5) and check for any visible signs of drag. 6. Press bearings (9) into bearing bores of pinion gear (10). Be sure bearings are seated against shoulder in pinion gear. 6. If the dial indicator reading is less than 0.381 mm (0.015 in) additional shims (15, 16 & 17) will have to be installed. A greater reading than 0.635 mm (0.025 in) means that some shims (15,16 & 17) will have to be removed. 7. Position pinion gear (10) and bearings (9) assembly in housing (12). Install a new 'O' ring (7) on pinion shaft (8).
Insert pinion shaft (8) through pinion gear (10) and bearings (9), lining up set screw hole in pinion shaft (8) with set screw hole in housing (12). 7. After the correct backlash is obtained, remove the block preventing the gear from revolving. Install pipe plug (6) in housing (12) and secure the power takeoff 3 SM 1178 2-98