Terex TR60 — Sm1564

Suspension System - Front Ride Cylinder Section 180-0030 b) Make a fill-fitting by drilling through a 5/8 - 18 x 1.50 in bolt and tapping the head end of the hole 1/4 NPT. SM - 1273 Use either of these methods for filling the ride cylinder and reinstall the standard fitting for machine operation. 2. With cylinder rod in its retracted position, fill the cylinder until oil flows free of air bubbles from charging valve (4) port. It may be necessary to wait 30 or more minutes after nitrogen pressure has been released to clear the foam which has formed inside the cylinder. 3.

Remove oil fill equipment, reinstall pipe plug (2) in check valve (3) or reinstall check valve (3) if it was removed at Step 1. Reinstall the nitrogen charging valve (4) in its port. 1 - Line 2 - Valve Chuck 3 - Valve Extension 4 - Cylinder Valve 5 - Pressure Gauge 6 - Tank Valve 7 - Gland Fitting 8 - Gland Nut 9 - Cylinder Adaptor 10 - Bleeder Valve WARNING Use dry nitrogen to charge cylinder. Do not use a gas such as oxygen which, if used by mistake for pressurizing, will explode violently when coming into contact with oil or grease, possibly causing personal injury and property damage. Fig.

9 - Charging Assembly To charge both cylinders simultaneously with nitrogen, a tee piece, coupling, two hoses (1, Fig. 9), valve chuck (2, Fig. 9) and valve extension (3, Fig. 9) can be added to the charging assembly (See Fig. 9). Assembly of this kit is described under 'Special Tools'. valve (6, Fig. 9). Open the valve on the nitrogen bottle slowly and note the reading on pressure gauge (5, Fig. 9). The available pressure in the nitrogen bottle must be over 31 bar (450 lbf/in 2 ). 4. Attach the charging assembly kit to the nitrogen bottle by turning down on gland nut (8, Fig. 9). 7. Close tank valve (6, Fig. 9) and open cylinder valve (4, Fig. 9).

Charge both cylinders to height 'A', shown in Fig. 8, by opening tank valve (6, Fig. 9) slowly and closing it occasionally. To check pressures in the cylinders, close tank valve (6, Fig. 9) and note the reading on pressure gauge (5, Fig. 9). 5. Install valve chucks (2, Fig. 9) to nitrogen charging valve (4) as follows: a. Rotate 'T' handle of valve chucks (12) anticlockwise until they stop. Note: If both cylinders do not extend evenly, check rear ride cylinders. Both rear ride cylinders should be extended equally (both can be fully collapsed). Also check that the truck is on a flat, level surface and empty. b. Screw the swivel nuts down on nitrogen charging valves (4) until they seat. c.

Turn small hex on nitrogen charging valves (4) two to three turns anticlockwise to unseat the valves internally. Note: The cylinder should be charged to the height shown in Fig. 8 and MUST NOT be over charged above the recommended height. Overcharging can cause the cylinders to over extend, thus damaging the piston retaining bolts. d. Rotate 'T' handles clockwise until they seat, opening check valves (valve cores) in nitrogen charging valves (4). Note: The cylinder charging pressure shown in the following chart is for REFERENCE only. Cylinders should be charged according to the height specified in Fig. 8 and NOT solely on the basis of monitoring cylinder pressure. 6.

To check the amount of pressure in the nitrogen tank, close cylinder valve (4, Fig. 9) and open tank SM 1584 12-98 8