Kaiyi BR380JG-1E0 — REPLACEMENT OF BELT

SEN02738-00 50 Disassembly and assembly Replacement of belt 1 When performing the following work, call a belt sticking work subcontractor (Operation and Mainte- nance Manual 7-15) as a supervisor. Ask the sub- contractor to carry out the sticking work (vulcanization at normal temperature) in the field. 1. Loosen right and left tension adjustment bolts (1) alternately to reduce the belt tension. a Loosen the tension adjustment bolts fully. a Make a mark at the original tension point in advance. 3. Connect the existing belt and the new belt by strong lines (or wires). (The following is shown for reference: Contents of work performed by the subcontractor) 2.

Cut the belt a The cut point shown in the figure is for ref- erence only. a Cut the belt in a place where you can work easily. a If right and left head pulley joints (3) and (4) are removed, the motor will be mis- aligned and may be broken. Accordingly, do not remove those joints. (A) Connect by strong lines (or wires) at mini- mum of 3 points (both ends and center). (B) Strong line (or wire) Cut belt 18 BR380JG-1E0