Kaiyi BR380JG-1E0 — REPLACEMENT PROCEDURE FOR PRIMARY BELT CONVEYOR HEAD PULLEY FRAME

50 Disassembly and assembly SEN02738-00 13. Remove frame assembly (10) as a unit. 16. Position the head pulley and motor flange and connect them with bolts (15). 14. Install motor (12) and flange (13) to new frame (11). 17. Install cover (16) to the head pulley frame and secure it with bolts (17). 15. Sling frame assembly (14) with the crane. 18. Go to step 29 (Sub-assembly of head pulley frame). BR380JG-1E0 25