Downloaded from https://www.everyspec.com MIL-HDBK-502: A MIL-HDBK-502: A CQUISITION CQUISITION L OGISTICS OGISTICS The Logistician’s Role in Development of Section L Acquisition logistics involvement in major planning and program efforts such as life cycle cost management, design to cost management, and management of information systems should be described. The logistician should ensure that in this section the offeror identifies where the logistics management effort is located within the overall organization structure and defines the logistics manager’s functional relationship with other managers. Information which may be required includes:
systems engineering system safety testing reliability maintainability support equipment hazardous materials management 8.4.14 Section M: Evaluation Factors for Award Section M conveys the basis for evaluation of the proposals received. Evaluation factors must be measurable, meaningful, traceable, and limited to contractor controllable items. For industry, Section M is the proposal manager’s primary focus. If the proposal does not do well against the evaluation criteria, it loses. Critical logistical factors must be contained in Section M to be guaranteed serious consideration by the offeror. Remember that the solicitation you prepare will be used to evaluate the offerors' proposals.
The criteria included in the solicitation must be consistent with service policy. This consistency requires tailoring the evaluation criteria or program characteristics. Define the criteria carefully in order to identify the rank order of importance of technical, logistics, costs, schedule, past performance, and other factors as set forth in the source selection plan. If the acquisition logistics is to be meaningful, its rank and value in selection process will be clear. Fully defined criteria: Indicate that the government decision makers have thought out their priorities. Inform the offerors of the order of importance the government has attached to the major needs. 8-17