everyspec.com n/a — MIL-HDBK-502: Department of Defense Acquisition Logistics Handbook PDF Download

Downloaded from https://www.everyspec.com MIL-HDBK-502: A MIL-HDBK-502: A CQUISITION CQUISITION L OGISTICS OGISTICS overall objective, however, is to ensure satisfactory operation of the equipment/systems expected to be engaged during wartime through sound maintenance practices and prudent posturing decisions. The core and acquisition processes converge during the early stages of acquisition when planning for depot support takes place and also during the source of repair decision process. Early in the life cycle, a core analysis is conducted to determine if depot support planning should commence.

Later in the system’s life cycle, when more precise maintenance data becomes available, the source of repair analysis is completed based upon the outcome of the core methodology (specifically, the assessment of private capability). The inherent logic dictates that when core capability requirements are adequately sustained and maintenance sources exist in the private sector that can provide the required capability and capacity with acceptable risk, reliability, and efficiency at reasonable cost, then competition and best value procedures should be used to choose a source of repair.

9.4 ADDITIONAL INFORMATION Use of Integrated Product and Process Development and Integrated Product Teams in DoD Acquisition, Secretary of Defense Memorandum, May 10, 1995. Rules of the Road - A Guide for Leading Successful Integrated Product Teams, Under Secretary of Defense for Acquisition and Technology, November 1995. DoD Guide to Integrated Product and Process Development, Under Secretary of Defense for Acquisition and Technology, February 20, 1996. Naval Air Systems Command Integrated Program Team Manual 9-13