everyspec.com n/a — MIL-HDBK-502: Department of Defense Acquisition Logistics Handbook PDF Download

Downloaded from https://www.everyspec.com MIL-HDBK-502: A MIL-HDBK-502: A CQUISITION CQUISITION L OGISTICS OGISTICS The transportability portion of Packaging, Handling, Storage and Transportation (PHS&T) summaries is also applicable during Phase I since high level transportation requirements can be determined. These transportation requirements can be checked by each service’s transportability command to insure the system’s parameters fit within the requirements of the theater to which they will be transported. After all, we do not want to build a tank to operate in the European theater that is too wide to fit through local railway tunnels when being transported.

Phase II and Phase III Life Cycle Applications These phases (Engineering and Manufacturing Development, Production, Fielding/Deployment, and Operational Support) usually allow less design influence from a logistics standpoint, but provide detailed information concerning such things as preventive and corrective maintenance actions and the required spares and support equipment. The Maintenance Planning summaries can be used to review contractor specified maintenance actions and ensure they are aligned with the maintenance concept. These summaries could also be used as a preliminary check in the development of technical publications.

Repair Analysis summaries can be used to identify the optimal support structure and assist in development of SMR codes and maintenance products. They are also applicable to fielded systems as an analysis tool when: a major increase or decrease in an item’s cost or failure rate occurs. an engineering change proposal is submitted. a change from total contractor support to organic support is under consideration. fielded system review is scheduled. Supply Support summaries can be used as preliminary checkpoints before data is loaded into the required provisioning system, or they can serve as the actual deliverable product.

Obviously, Supply Support type summaries are applicable to fielded systems when an engineering change proposal is submitted; or a change from contractor support to organic support is being considered; or as part of a scheduled fielded system review. Support and Test Equipment summaries can provide data necessary to register, or verify the registry of, the support or test equipment in the government’s inventory. Manpower, Personnel, and Training summaries can be used to verify that manpower and skill level requirements or thresholds are being met. Also, these summaries could be used to identify new or modified skill level 7-6