Downloaded from https://www.everyspec.com MIL-HDBK-502: A MIL-HDBK-502: A CQUISITION CQUISITION L OGISTICS OGISTICS REPAIR ANALYSIS SUMMARY SUMMARY: Analysis was performed based upon planned fielding to all 46 sites currently employing the Auton- omous Robotics System (ARS) as well as the 23 sites where fielding is planned. The IPCS will replace existing PCSs at the current sites and will be fielded with the ARS at the other 23. As the ARS Test Set has already been developed, fielded to the existing sites, and programmed for the other sites, its cost was considered sunk. Develop- ment costs for the revised test program set have been included.

Training costs have not been included, as no addi- tional training requirements exist over current training program. No additional equipment costs are foreseen for the contact team. Annual operating time of 2400 hours per system was considered, per existing ARS specification.

ITEM Remove/Replace Repair Dispose IPCS n/a USER n/a CONTROL UNIT USER ORG DEPOT KEYBOARD ORG TOSS 1 CONTACT TEAM INTERFACE UNIT ORG CONTACT TEAM DEPOT DISPLAY ASSY CONTACT TEAM DEPOT n/a DISPLAY DEPOT DEPOT DEPOT CABINET DEPOT DEPOT DEPOT CCA DEPOT MANUFACTURER n/a CPU ORG CONTACT TEAM DEPOT POWER SUPPLY CONTACT TEAM TOSS CONTACT TEAM CCA Controller CONTACT TEAM DEPOT DEPOT CCA Memory CONTACT TEAM TOSS 2 DEPOT ANTENNA ASSY n/a n/a n/a ANTENNA USER n/a 3 USER CABLE ASSY USER CONTACT TEAM CONTACT TEAM POWER ASSY n/a USER n/a BATTERY ASSY USER n/a DEPOT 4 CABLE ASSY USER CONTACT TEAM DEPOT AC/DC CONVERTER USER TOSS CONTACT TEAM . NOTES:

1 While most repairs by removing and replacing components is not cost effective, a general cleaning in the contact shelter with existing ARS equipment may return some items to service. 2 Although the capability exists to replace blown memory chips and the overall support costs are slightly lower than the toss option (see page 3 for cost comparison matrix), the low failure rate of the card (see input values beginning on page 6) together with the rapidly expanding capabilities of the technology lead us to recommend tossing the memory cards. . 3 No analysis of antenna was performed, as is simply not repairable.

4 Disposal at depot is selected not based upon economics but rather on environmental laws and concerns. This decision was documented during the Critical Design Review and the information is simply presented here to be all inclusive of the system. Assumptions and Sensitivities: 1. No estimates of failure rates were available from the manufacturer of the display CCA. While the new CCA is marketed as far more reliable, the value of the old CCA was used. Sensitivity analysis performed using values from 75% to 150% showed no change in maintenance policy. Figure 7-3. Sample Repair Analysis Summary 7-10