Downloaded from https://www.everyspec.com MIL-HDBK-502: A MIL-HDBK-502: A CQUISITION CQUISITION L OGISTICS OGISTICS 7.5.2 LMI Data Products There are 159 data products identified in Appendix B of the LMI specification. A requiring authority may select one or more of these data products as a product deliverable using Worksheet 2 (Appendix B of the LMI specification). If multiple data product deliverables are required at different times, these worksheets can be used multiple times.

For example, the requiring authority may want to use the worksheets to get data for a Long Lead Time Items List (LLTIL) and fill out the worksheets again to get data for some other provisioning list which is not required as early as the LLTIL. The first page of Worksheet 2 includes a place to specify a specific data product deliverable (e.g., LLTIL) and Select codes with Select Explanations that can be applied on the worksheets for each data product. The remaining pages of Worksheet 2 provide an alphabetized list of the 159 data products and any associated names for a given data product that is subordinate to it.

A user can select the basic data product, an associated name to the basic data product, or both. To the right of the data products are two columns: Select column - Select codes from the first page can be applied Additional Information - a general information section Different Select codes can be applied to different data products. The user can select one data product for all items, another data product only for commercial items, and yet another data product only for support equipment. If necessary, the requiring authority can use the blank lines provided on the first page of Worksheet 2 to define program specific selection needs.

Use the Additional Information column to further clarify any documentation requirements required for a given data product. This clarification may include “level of detail” information ( Select codes provide similar information). The level of detail should correspond to the government’s data needs based on the type of acquisition, life cycle phase, and the degree of program control desired by the program manager. Use this column to specify that a particular data product should be delivered as part of list, such as an LLTIL. Use it to address when data product(s) should be delivered (e.g., 90 days after start of work, or 30 days prior to Milestone II Review, etc.).

Basically, this column can be utilized any way the requiring authority wants. The following pages contain an example for utilizing Worksheet 2 to obtain LMI data products. This example (Figure 7-12) shows how to get data specifically for a LLTIL. 7-23