mean-well DRS - 240 / 480 Series — Mean Well DRS 240/480 Series Power Supply User Manual PDF

5 In the initial stage of charging, the charger charges the battery with the maximum current, and the fan is ON (built-in fan model). After a period (depending on the battery capacity), the charging current decreases. When the charging current drops to 10% of the LED indicator lights up in green, indicating that the charging process is complete. If the charging is finished, power supply In the initial stage of charging, the charger charges the battery with the maximum current. After a period (depending on the battery the charging current gradually decreases. When the of the rated current.

LED indicator up the charging is complete and the in will turn off the output of charger, but remain the output of load. s DRS-240-48 100% CC 3.85A 57.6V boost V 10% CC 5.3.1 2-stage charging (DIP switch on “2”stage) DRS-240-24 DRS-240-36 7.7A 5.1A 28.8V 43.2V DRS-480-48 57.6V 5.3.2 3-stage charging (DIP switch on“3”stage) Stop charging stage 1 stage 2 Battery Full Orange Green 7.7A DRS-480-36 10.2A 43.2V C.V DRS-240-12 DRS-480-24 C.C 15.4A 14.4V Vboost 15.4A 28.8V ON ON 2 1 2 1 3 5.2.1.

When AC :79~89VAC , 132~187VAC mains drops below of 120VAC of 220VAC UPS function will activate and power source switch battery , DIP switch on panel is used for charging curve selection, 2-stage or the 3-stage. 2-stage in C.C and C.V is fast charging. 3-stage cluding simple in C.C, C.V and F.V will turn off after 2-stage of charging cluding not finished. User can choose between 2- or 3-stage according to the s Note: DC UPS function will not be achieve in 5 seconds at first start-up. 10AH 20AH 50AH 100AH 200AH 133h 67h 40h 27h 20h 13h Note: From AC to battery, switch period is 10ms.

within DC OK Battery abnormalities Charging malfuction 350min Relay signals 67h 33h 20h 13h 10h AC Fail Battery capacity Back-up time depends on Load current 33h 17h 600min 350min 240min 125min Load 350min 180min AC input Battery Butto m Example: (C10 discharging) 13h 90min 60min 35min 15 Charging Battery 350min 125min 60min 35min 23min 13min 5.3 Battery harging c Modbus ( CANBus) Optional 5.2.2. Back-up time Battery 5.2 DC-UPS backup. 1.5A 3A 5A 7.5A 10A 15A demand.

Load 5 ing e ing C.C nt stage 1 C.C C.V Stop charging stage 2 Battery Full Battery Load 10AH 20AH 50AH 100AH 200AH 1.5A 350min 13h 33h 67h 133h 3A 125min 350min 17h 33h 67h 5A 60min 180min 600min 20h 40h 7.5A 35min 90min 350min 13h 27h 10A 23min 60min 240min 10h 20h 15A 13min 35min 125min 350min 13h Status DRS-240-12 DRS-240-24 DRS-240-36 DRS-240-48 C.C 15.4A 7.7A 5.1A 3.85A Vboost 14.4V 28.8V 43.2V 57.6V Status DRS-480-24 DRS-480-36 DRS-480-48 C.C 15.4A 10.2A 7.7A Vboost 28.8V 43.2V 57.6V