Delta DVP-ES3 — 6.14.2 Explanation of Structure Creation Instructions

Chapter 6 Applied Instructions Example 3 If the program between FOR and NEXT is not to be executed, you can skip it with the CJ instruction. When M1 in network 8 is ON, the instruction CJ is executed. The execution of the program jumps to LABEL 1:, i.e. network 12, and network 9 – 11 are not executed. 6_ 6-405